subpart
225.2--buy american act--construction materials
(Revised April 30, 2003)
225.202 Exceptions
225.206 Noncompliance
225.202
Exceptions.
(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a) or in 225.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103(b)(ii). Use the estimated value of the construction materials to determine the approval level.
225.206 Noncompliance.
(c)(4) Prepare any report of noncompliance in accordance with the procedures at 209.406-3 or 209.407-3.